Home
/
Airports
/
Main projects
Airport references
Study of the management model for the new Lleida-Alguaire Airport (Spain)
2009
Catalonia Airports
Consultancy for the organisation of the tender process for construction and operation during concession of the new airport in the Murcia region (Spain)
2008-2007
Public Works Council, Murcia Regional Govt.
Analysis of the Andalusian airport system
2008/2003
Junta de Andalucía
Evaluation study of airports at tourist destinations in competition with the Costa del Sol
2008
Malaga City Council Society for Planning and Devel
Capital expenditure evaluation for acquisition of Brussels Airport
2004
Confidential
Creation of reports and study on the Spanish airport system
2008/2007/2006/2001
Consejo Superior de Cámaras de Comercio, Industria y Navegación
Creation of noise footprints for the 12 main airports of Morocco
2009
ONDA
Feasibility study and selection of location for new Huelva Airport (Spain)
2008/2007
Excma. Diputación de Huelva
Feasibility study for the expansion of Kerry Airport (Rep. of Ireland)
2008
Kerry Airport
Master plan and functional study of new Murcia International Airport (Spain)
2006-2005
C.Obras Públicas.Gobierno de la Región de Murcia
Master plan, aeronautical limitation surfaces and construction projects for Ciudad Real Airport (Spain)
2005/2002
Ciudad Real Aeropuertos
Creation of noise footprint for different takeoff and landing configurations across two runways (Spain)
2002
AENA Malaga
Functional study for the development of the airfield. Murcia Regional Airport
2002
Murcia Region Airports
Geometrical study on achieving a second runway at Malaga Airport (Spain)
2001
AENA - Málaga
Functional study on the new terminal at Malaga Airport (Spain)
2000
AENA - Málaga
Feasibility study on the opening of the Los Llanos airbase to public traffic (Albacete, Spain)
2000
Development Office of Albacete
Aeronautical safety study of the new combined cycle plant at Malaga Airport (Spain)
2009
Endesa Generación
Aeronautical study of the safety of the high voltage overhead electrical lines at Gava (Spain)
2009
Sinergis
Aeronautical safety study of the urban development of the radio marker safety area at Granada Airport (Spain)
2008
Miliario
Aeronautical study of the safety of the high voltage overhead electrical lines in Palma de Mallorca (Spain)
2005
Cobra
Aeronautical study of the safety of the high voltage overhead electrical lines in Tenerife (Spain)
2005
GESA
Evaluation of forest landing-strips and helipads in Castilla La Mancha and their adaptation to OACI regulations
2007
Heliduero S.L.
Evaluation of forest landing strips and helipads in Castilla León and their adaptation to OACI regulations
2007
Heliduero S.L.
Evaluation and elaboration of the technical documentation for the legalisation of the heliport at Formigal ski resort
2007
Formigal S.A.
Adaptation, legalisation and site management of the helipad at the Pallars Hospital in Tremp
2005
Catsalut
Alcantari Airport (Sucre, Bolivia)
2007
Prointec
Detailed project design and supervision
New Castellon Airport ‘Costa Azahar’ (Spain)
2006
FCC-Lubasa
Planning and construction projects
Ciudad Real Central Airport (Spain)
2005-2002
Ciudad Real Airports
Planning and construction projects
New rapid exit taxiways at Palma de Mallorca Airport (Spain)
2008
AENA
Basic project
New Runway at Las Palmas de Gran Canaria Airport (Spain)
2007
AENA
Basic design
Reconstruction of runway and associated works at Birmingham Airport
2006-2004
Birmingham Airport- RPSBurksgreen
Constructive design and site assistance
Expansion of apron and reconstruction of taxiways at Gran Canaria Airport (Spain)
2006
AENA - Central Services
Construction project
New apron, taxiways and definition of new LVP (Low Visibility Procedures) at Dublin Airport
2006
DAA en colaboración con BURKSGREEN
Construction project
New rapid exit taxiways. Malaga Airport (Spain)
2005
AENA - Central Services
Construction project
Airfield with code 4F runway and parallel taxiway for Ciudad Real Airport (Spain)
2003
Sacyr-Isolux
Planning and construction projects
Expansion of eastern apron for three B767 stands at Tenerife North Airport (Spain)
2002
AENA - Central Services
Detailed project design
Taxiway up to thresholds at Granada Airport (Spain)
2001
AENA - Central Services
Detailed project design
Airfield with a 1,000m runway extension and adaptation of the parallel taxiway to function as an emergency runway, at Fuerteventura Airport (Spain)
2001
AENA - Central Services
Design and construction project
Resurfacing of taxiways at Seville Airport (Spain)
2001
AENA
Works control and supervision, control of materials, and health and safety coordination
Holding areas and expansion of general aviation apron at Malaga airport (Spain)
2000
AENA - Central Services
Detailed project design
120,740 m2 apron expansion at Malaga Airport (Spain)
2000
AENA - Central Services
Detailed project design
Reconditioning of runway and apron at Malaga Airport
2000
AENA Central Services
Control and supervision of works and control of materials
Control tower. Lleida Alguaire (Spain)
2008
Generalitat de Catalunya (Catalonian Government)
Detailed Project
New control tower at Pamplona Airport (Spain)
2007-2006
AENA- Central Services
Detailed project design
New control tower for Malaga Airport (Spain)
2003
AENA
and supervision of works and health and safety coordination
Control tower, Ciudad Real Airport (Spain)
2003
SACYR-ISOLUX
Construction project design
Approach room on the ground floor of new control tower. Malaga Airport (Spain)
2002
AENA - Málaga
Control and supervision of works and health and safety coordination
Expansion of terminal area. Malaga Airport (Spain)
2009-2001
AENA
Detailed project design
New Terminal building at Gibraltar Airport
2009
Dragados (Government of Gibraltar)
Execution project design
New terminal area in Pamplona Airport (Spain)
2006
AENA
Detailed project design
Passenger terminal complex. Ciudad Real Airport (Spain)
2003
SACYR-ISOLUX
Construction project design
Passenger terminal and urban development at Ciudad Real Central Airport (Spain)
2003
SACYR-ISOLUX
Construction project design
New regional terminal at Malaga Airport (Spain)
2000
AENA - Málaga
Detailed project design
General aviation services area at Malaga Airport (Spain)
2002
AENA - Málaga
Detailed project design
Corporate aviation terminal at Barcelona Airport (Spain)
2002
AENA Barcelona (Artigues & Sanabria)
Detailed project design
New General aviation building for Malaga Airport (Spain)
2001
AENA - Central Services
Detailed project design
Design of commercial areas for new terminal buildings at Malaga and Alicante airports (Spain)
2006
AENA - Central Services
Technical assistance in basic project design
Renovation of the commercial, shopping and services areas. Barcelona Airport (Spain)
2002
AENA - Barcelona
Detailed project design
Refurbishment of shopping area on Level+13 of terminal T2. Malaga Airport (Spain)
2001
AENA - Málaga
Detailed project design
AGL, vertical markers and lighting systems at Guernsey Airport (United Kingdom)
2008
RPS
Basic and detailed project design
Basic design of AGL and NAV Aids at City of Derry Airport (Northern Ireland)
2006
Derry City Council – RPS Burks Green
Preliminary design and technical assistance
AGL and refurbishment of electrical system for new apron and taxiways
2006
DAA (Dublin Airport Authority) - RPS BurksGreen
Detailed project design
AGL and adaptation of electrical and control system for apron 5E and new taxiway M1
2006
DAA (Dublin Airport Authority) - RPS BurksGreen
Detailed project design
Master plan for Dublin Airport AGL
2006
DAA (Dublin Airport Authority) - RPS BurksGreen
Technical consultancy
Feasibility study for instrumental approach systems at Barra Airport (United Kingdom)
2004
Highland & Island Airports Ltd. (Burksgreen)
Technical consultancy
AGL and NAV Aids at Ciudad Real Central Airport (Spain)
2003
Sacyr-Isolux
Detailed project design
Control and management of the electrical network at Jerez Airport (Spain)
2009-2008
AENA
Site control and supervision, materials control and health and safety coordination
Technical assistance for electrical systems during various airfield construction works
2008-2007
DAA (Dublin Airport Authority)
Technical assistance
Remodelling of electric system in Malaga Airport (Spain)
2008-2005
AENA
Control and supervision of works, and health and safety coordination
New 66kV electrical substation CELTSUR, reorganisation of 20kV rings, new substations and adaptation to the Malaga Airport electrical configuration
2008
AENA
Detailed project design
Improvements to feasibility of electrical system at Barcelona Airport (Spain)
2008
AENA
Detailed project design
New ring system and automation of substations at Reus Airport (Spain)
2008
AENA
Control and supervision of work and health and safety coordination
Complementary works to the supply and installation of new generator sets and auxiliary systems at Malaga Airport (Spain)
2008
AENA
Site supervision and health and safety coordination
Alterations to MV ring (10kV) and new airside electrical substation
2006
DAA - BURKSGREEN
Detailed project design
Electrical substation with a 15,000V connection and capacity to produce 4.95MW for Ciudad Real Central Airport (Spain)
2003
SACYR-ISOLUX
Construction project design
Installation of new generators and improvements to electrical substation at Malaga Airport (Spain)
2001
AENA
Control and supervision of works and health and safety coordination
Fire station. Ciudad Real Airport (Spain)
2003
SACYR-ISOLUX
Construction project design
Security centre and emergency operations building at Malaga Airport (Spain)
2002
AENA
Detailed project design
Luggage handling and inspection building at Fuerteventura Airport (Spain)
2002
AENA - Fuerteventura
Detailed project design
Aeronautical observation centre on top of fire station
2002
AENA - Jerez
Detailed project design
Cargo terminal building at Malaga Airport (Spain)
2007
Ineco-Tifsa
Detailed project design
Cargo terminal building at Ciudad Real Airport (Spain)
2003
SACYR-ISOLUX
Construction project design
Cargo terminal building at Fuerteventura Airport (Spain)
2002
AENA
Detailed project design
Hangar at EADS CASA factory in Getafe (Madrid, Spain)
2006
EADS CASA
Detailed project design and site management
‘Tiger’ helicopter maintenance hangar at Almagro army base (Ciudad Real, Spain)
2006
Army
Detailed project design and execution
Supervision of Service Quality Levels of assistance for people with reduced mobility at Barcelona Airport (Spain)
2009-2008
AENA-Barcelona
Monitoring of service quality levels provided by the ground handling agents at Barcelona Airport (Spain)
2009-2008
AENA-Barcelona
Supervision of service and quality levels provided by people with reduced mobility assistance contractors at the airports of Madrid-Barajas, Barcelona, Malaga, Tenerife South, Las Palmas, Palma de Mallorca, Alicante and Almeria (Spain)
2009
AENA
Monitoring of service quality levels provided by the ground handling agents at Palma de Mallorca Airport (Spain)
2008-2007
AENA-Palma de Mallorca
Monitoring of service quality levels provided by the ground handling agents at Seville Airport
2007
AENA-Sevilla
Verification of quality parameters for ground handling services at Malaga Airport (Spain)
2003
AENA-Malaga
Creation of Emergency plan for Lleida-Alguaire Airport (Spain)
2009-2008
Aeroports de Catalunya
Safety plan at Lleida-Alguaire Airport (Spain)
2009-2008
Aeroports de Catalunya
Updating, management and maintenance of the emergency plan and security programme at Malaga Airport (Spain)
2009-2000
AENA-Malaga
Updating of emergency plan and organisation of emergency drill at Jerez de la Frontera Airport (Spain)
2008
AENA-Jerez de la Frontera
Updating and maintenance of the emergency plan and emergency manual at Malaga Airport (Spain)
2008
AENA-Malaga
Maintenance of the security programme at Malaga Airport (Spain)
2008
AENA-Malaga
Fire safety risk assessment and emergency plan for Malaga Airport
2001
AENA-Malaga
Certification process for the commissioning of Lleida-Alguaire Airport (Spain)
2009-2008
Generalitat de Cataluña
Data network for the automated baggage handling system at Fuerteventura Airport (Spain)
2009
CRISPLANT-AERTEC
Engineering for the integration of operational systems, facilities control and security systems for ISDEFE at Malaga Airport (Spain)
2008-
ISDEFE
Support engineering for telephony, public address system, commercial TV, distribution of IP video and mobile communications for ISDEFE as part of Plan Levante (Spain)
2008-
ISDEFE
Support engineering for IP video, commercial TV and public address system for ISDEFE at the new Barcelona Airport area (Spain)
2007-
ISDEFE
Security projects for Malaga’s new airport environment (Spain)
2007-
AENA Central Services
Project management of perimeter road, barriers and access control systems at Barcelona NEA
2007
AENA-Plan Barcelona / TIFERCA-SOCLESA
Expert software support for the installation of an automated baggage handling system at Barcelona Airport (Spain)
2007
UFIS Airport Innovation
Information systems maintenance service at Fuerteventura Airport (Spain)
2006
AENA - Fuerteventura
I.T. support at Menorca Airport (Spain)
2006
AENA - Menorca
Development of a software application for the control of medical intervention
2009
TELVENT
Parameterisation, commissioning and maintenance of eight AVA – Airport Virtual Assistant units at Madrid Barajas Airport (Spain)
2009
EULEN
Installation and commissioning of mpromisys ground handling module at Barcelona Airport (Spain)
2009
AERTEC
Installation and commissioning of mpromisys ground handling module at Palma de Mallorca Airport (Spain)
2009
AERTEC
Application of activity registry for customer attention staff at Ibiza Airport (Spain)
2009
Mantres servicios
Parameterisation and installation of disc management tool at Seville Airport (Spain)
2008-
AERTEC
Installation and commissioning of mpromisys ground handling module at Malaga Airport (Spain)
2008
AENA Málaga
Parameterisation, installation and commissioning of promisys at Almería Airport (Spain)
2006
AENA Aeropuerto de Almería
IT support tool for customer services personnel
2006
AENA - Madrid
Airport process monitoring system (PROMISYS)
2005-
AENA - Tenerife Norte
Airport process monitoring system (PROMISYS) - PHASE I
2005-
AENA- Tenerife Sur
Development of software and operation services of document management web portal at Gibraltar Airport (British overseas territory)
2009
DRAGADOS
Modification of various software applications at Barcelona Airport (Spain)
2009
AENA Aeropuerto de Barcelona
Development and commissioning of mpromisys airbridges at Barcelona Airport (Spain)
2008
TRABOSA
Airports
Consultancy
Infrastructures
Airport operation
Systems
Contact
Alan MacGuire
T: (+34) 902 06 01 00
View profile
Corporate brochure
Main projects
Featured project
New terminal T3 Malaga airport
New terminal T3 Malaga airport
 